System integration for solar and storage projects

Bring us the application, load and installation conditions. We help define the equipment and interfaces, then agree the supply and support scope.

A practical route from requirements to supply.

  1. 01

    Define the project

    Start with the installation country, electrical supply, load profile, PV and energy requirement.

    Project brief · kW / kWh · operating mode
  2. 02

    Match the equipment

    Review battery, inverter or PCS, electrical limits, BMS communication and firmware for the selected configuration.

    Model selection · interfaces · configuration scope
  3. 03

    Agree the supply scope

    Confirm the equipment list, destination version, required documents, delivery schedule and service responsibilities.

    Equipment list · document package · quotation
  4. 04

    Coordinate delivery

    Plan procurement and dispatch, with installation and commissioning support defined for the project.

    Dispatch plan · handover · agreed support
Confirmed equipment pairing

Hithium 261 kWh DC + Growatt WIT 63–125K-XHU

A confirmed battery–inverter pairing. Exact inverter rating, firmware, controls and project requirements still form part of the final configuration.

Confirmed equipment pairing

Hithium 261 kWh DC + Growatt WIT 63–125K-XHU

Compatibility is specific to the selected equipment and configuration. Other Hithium batteries and other inverter series need their own technical review; an existing pairing does not establish compatibility across the portfolio.

Agree the deliverables before work starts.

Equipment lists, interface notes, single-line diagrams, EMS requirements and commissioning support can be scoped to the project. Local approvals, installation responsibility, warranty and on-site support are agreed explicitly in the quotation.

Explore project applications
Sunket Supply · B2B procurement

Tell us what you need to source

Send a model list or project requirement. We will review the equipment version, destination, availability and integration scope for your quotation.

Head office

Room 1701-1, Jizhi Business Plaza, No. 19 Erquan East Road, Xishan District, Wuxi City, China

Tell us what you need to source.

Only your name, email and phone are required. Model, quantity and project details are optional.

Country code preferred. Local numbers and extensions such as ext. 123 are accepted.
Add project details (optional)

Model, quantity, destination or a purchasing list — share what you know.

Enter the final installation country. UAE-based traders: this may differ from your company’s location.
Enter the exact model, or “Model to be confirmed” if you need help selecting it.
Specify kW for power and kWh for storage, together with phase or grid requirements.
Number of units or systems; explain the unit in your project notes.